The ARALCI
plant is a state-of-the-art, fully automated factory. Technical features of the plant
inlcude a loading capacity of 800 tons per 8 hours and any sort of product can be
manufactured with a ratio of 100%. The plant, bearing and environmentalist character
thanks to the pollution prevention filters installed on the system, has no waste material
and is environmetally firendly.
One of the major
attributes in plaster production is the purity rate of the gypsum. Along with the 8
operation certificates that ARALCI bears, the kiln plant is operated with a gypsum purity
rate ranging from 99,2% to 99,9% thanks to the accurate operations performed. In
addittion, the calcite utilized as ancillary material is extracted from its own pits and
used at plaster factory by micronization. Both gypsum and calcite stone add amblance to
the product and comply with our principle of the whitest and the best quality.
Our factory is established at an area of 175.000 m2 and there is an inter-factory railway
which passes form raw material field and reaches the packaging field.
ARALCI, which aims to build a plasterboard facility will be a leader at plaster industry
and realize to establish a structure which is followed and imitated.
AR Gypsum hand
plaster with perlite, packed 30 kg bags.
AR Gypsum
machine plaster, packed 30 kg bags.
AR x-Ray
shielding gypsum plaster, packed in 30 kg bags.
AR
finishing plaster, packed in 30 kg bags.
AR construction
plaster, packed in 30 kg bags.
.
AR Gypsum
Factory, with all its employees and well trained technical personnel motivated to serve
our customers.
AR Gypsum
Research and development team is working to develop new products.
At AR Gypsum we
work for the comfort and well being of our customers. www.onlinesigarayason.com
|