3300 Izoline Bitumen Membrane

 

3300 Izoline Bitumen Membrane

Plastomeric type membrane with polyester felt (PP) or glass net (PC) bearing, that is produced with modified bitumen with atactic polypropylene (APP) admixture.
 

Has wide usage area, resistant to hot and cold weather conditions in moderate conditions,
 

TS 11758-1 certificated.

Application Fields
Terraces, pitched reinforced roofs, pools, water depots,
On basic curtain walls, on basement walls,
In artificial ponds, water channels, wet volumes, secret streams.
 
www.onlinesigarayason.com

 

Technical Features

Feature

Stan-dart

Unit

İzo-Coat

PC 2 mm

İzo-Coat

PC 3 mm

İzo-Coat

PP 3mm

İzo-Coat

PP 4mm

İzo-Coat

PC-AL 3 mm

İzo-Coat

PP-AL 3 mm

Reinfor-cement Type

   

Glass
Net

Glass
Net

Pol-yester

Pol-yester

Cam tülü

Pol-yester

Thick-ness

TS 11758-1

mm

2

3

3

4

3

3

Weight

TS 11758-1

kg/m2

2,2

3,2

3,2

4,2

3,2

3,2

Tempe-rature Resis-tance

TS 11758-1

OC

110

110

110

110

110

110

Curving
in cold

TS EN 1109

OC

-5

-5

-5

-5

-5

-5

Water Damp Proofing

TS pr EN 1928

-

Sui-table

Sui-table

Sui-table

Sui-table

Sui-table

Sui-table

Lenght-wise Strai-ning (Min.)

TS 1908

N / 5cm

> 300

> 300

> 600

> 600

> 300

> 600

Cross Strai-ning (Min.)

TS 1908

N / 5cm

> 200

> 200

> 400

> 400

> 200

> 400

Lenght-wise Strain

TS 1908

%

2

2

> 30

> 30

2

> 30

Width strain

TS 1908

%

2

2

> 30

> 30

2

> 30

En - Lenght

TS 11758-1

mm

1 / 10

1 / 10

1 / 10

1 / 10

1 / 10

1 / 10

Up Coating

-

-

PE Film

PE Film

PE Film

PE Film

Al Folyo

Al Folyo

Down Coating

-

-

PE Film

PE Film

PE Film

PE Film

PE Film

PE Film

Application Guideline
Pay attention that the application surface is dry, clean, uniform and strong.
Spread izocoat Astar to the surface. Make adhesion as heating the membrane and coat with the oxyacetylene burner after the coat dried. Make corbelling as minimum 10 cm. on the membrane's jointings. Obtain perfect adhesion on the overlappings.
If the ramp of the application surface is under %5, it is enough just to make adhesion on the overlappings. partial adhesion can be made with the point or linear dissolves for the ramps that are up to 40% , as they will spread to the adhesion surface homogeneously. The point and linear dissolves must cover 50% of the adhesion surface at least. Make a completely adhered frame on the insulated area for the applications of free adhesion and partial adhesion as 1m. at least. Surely make full adhesion for the ramps over 40 %.
Make full adhesion as turning the membranes that was adhered on the ground to the parapet and wall 20 cm at least. Previously roll the ground and wall joint corners with the cant as 4-5 cm.
Surely make full adhesion of the second coat on the first coat while applying the second coat membrane.
Spread the second coat membrane as it will center the first coat corbellings as confusing.
Start to the application as spreading the membrane parallely to the stream, from stream face, on the pitched surfaces. If the internal surface od the stream will also be insulated, start to coating from here.
Apply the protection layer (covering, concrete, wall, heat insulation plate, etc.) on it to protect the insulation membranes against to the atmospheric and mechanical effects. If Al foiled membranes had been applied on roofs that is not walked on it, no need to use the protective coating.

Warnings
Store the bitumen membranes in closed areas as right angle.
Keep the membranes away from the heat resources.
Do not store the bitumen membrane rolls as rough and tumble..
Wait the bitumen membrane roll for 24 hours over + 5 0C before the application in winters.